PDCA cycle: Plan-Do-Check-Act explained in 4 steps

PDCA stands for Plan, Do, Check, Act: a cycle with which you structurally improve the quality, processes, KPIs and goals of your organisation or team. You do not run through it once but continuously: daily, weekly, monthly or yearly. That turns it into a flywheel for continuous improvement.

Key takeaways

  • PDCA means Plan, Do, Check, Act, in that order. Act does not mean action but actualise: updating goals and plan.
  • A PDCA cycle is a feedback loop: you measure the output of a process, compare it with the norm and adjust, raising the bar each time.
  • Secure what works: standardise results achieved so that you do not fall back into old habits.
  • There are two variants: the light, regular one for optimising existing processes and the heavy, experimental one for larger changes and innovations.
  • A PDCA without KPIs is like a car without wheels: without reliable data and SMART KPIs the circle never starts turning.
  • The PDCA circle and the Deming circle are the same concept.

What is PDCA?

The PDCA cycle is a method that keeps a certain value moving around the norm while the bar is raised step by step, by repeatedly going through Plan, Do, Check and Act.

The order of the four letters is often mixed up, but Plan-Do-Check-Act is the only correct order for tackling improvement. Make a plan, because a goal without a worked-out plan is wishful thinking. Carry out the plan (Do), collect relevant process data and monitor and analyse the information. In the Check step you verify whether the results meet the goals and the target values of the KPIs. On the basis of that comparison you adjust, scale up or scale down (Act, in the sense of actualise).

Why a PDCA cycle?

With a PDCA cycle you set a continuous learning and improvement process in motion by giving KPIs, data analysis and human reflection a leading role. People who want to do their work with passion get the chance every day to improve their work process incrementally. That returns power to the craft.

The word “cycle” indicates a self-repeating process, also called a control loop or feedback loop: you measure the output of a process, compare it with the desired value and then act to improve the process, for example by reducing waste and rejects, shortening lead time or raising the quality of the end product.

The 4 phases of PDCA

  • Plan: define your plans and the expected results.
  • Do: test the plan and observe what happens.
  • Check: verify whether the results achieved are satisfactory.
  • Act: implement the method that delivered the desired results.

Phase 1: Plan

Managers and professionals draw up an (improvement) plan stating which results they want to achieve and how, taking into account the frameworks imposed on the work process. Plans and objectives are made SMART where possible with KPIs and norms. Inspiring people explicitly belongs here: the “why” must be crystal clear to everyone.

Phase 2: Do

Execution takes place, including the recording of events (input, processing and output). Professionals monitor execution through interactive dashboards and data analysis. People may make mistakes, but these are tackled directly at the source, and there is room to experiment. You do have to mobilise your people, which only works with sufficient capacity (so do not accept staff shortages) and quality (well-trained people).

Phase 3: Check

Managers and professionals compare the results actually achieved with the planned results: reality against the KPI norm and the plan. In practice there is often a gaping hole between the two worlds: the board sees things through rose-tinted glasses while the shop floor runs into hard reality. Intelligent, data-driven organisations see deviations as an opportunity to learn. They evaluate the gap and trace its root causes. In this phase you also appreciate people for what they have achieved.

Phase 4: Act

Adjustment and correction take place: interventions and measures to achieve the originally planned result after all. Managers adjust norms and KPIs, but generally keep raising the bar. Employees develop a mentality of a little better every day. You reflect together not only on the content, but also on the course of the entire PDCA.

Inspiring, mobilising, appreciating and reflecting, the IMAR cycle, is inextricably linked to these four steps of the traditional PDCA cycle.

Securing PDCA in the primary process

The PDCA cycle is emphatically not a one-off exercise: the effort is too intensive and the time too costly for that. Through continuous improvement cycles you want to realise structural quality improvements that are still acceptable, tenable and sustainable tomorrow. That means safeguarding the results that were often achieved with difficulty, so that you do not have to reinvent the wheel each time. This “securing” means: standardise what works and discard what does not turn out well.

PDCA example: make a sport of it

A concrete example close to home: reducing your own energy consumption, to counter waste and save money.

  • Plan: use a maximum of 150 kWh of electricity and 80 m³ of gas per month. Current consumption is 180 kWh and 125 m³. Your plan contains measures such as turning the heating off an hour earlier in the evening and installing LED lamps.
  • Do: you carry out the measures and receive the consumption data from your energy supplier via the app every month. You analyse the data, plot it over time in a chart and make the costs visible.
  • Check: after the first month you discuss consumption with your partner. You are at 179 kWh and 126 m³: far from enough to realise your plan.
  • Act: you add extra measures to the original plan, such as showering one minute less (for all family members) and leaving power-hungry appliances like the tumble dryer and television off.

You go through the circle until you reach your goal, or you adjust goals and norms because your housemates are grumpy about the shorter showers. But people are creatures of habit, so even in this simplified example it is essential to secure the results (no secretly showering a minute longer) while looking for new savings, such as limiting the dishwasher or switching off stand-by.

In work situations the principle is the same. A well-known showcase is Veiligheidsregio Noord-Holland Noord, a Dutch safety region that applied PDCA completely and won the Dutch BI & Data Science Award with it. See also PDCA in healthcare.

The 2 variants of the PDCA cycle

Light versus heavy PDCA

Both variants use the same KPIs; they differ in weight.

Light, regular

Heavy, experimental

Aim

Optimise existing processes

Larger changes, innovation

Where

In the line organisation

In a safe sandbox

Resources

Existing norms and KPIs

Often new skills or technology

Start

Monitoring results

Fundamental questions, redesign

Outcome

Small improvements

A new standard after a successful test

The light variant connects to the classic planning-and-control cycle: changes take place within the line without fundamentally changing processes or plans. If you encounter a problem that is too risky or disruptive to solve in the line, you start a separate PDCA from the Actualise phase as an experimentation space. Only after a successful experiment do you elevate the solution to the standard and return to the light variant.

11 PDCA tips and preconditions for success

  1. Going through the cycle pro forma is pointless. Take a care institution where, in the run-up to a certification audit two months away, everyone critically tests all processes and KPIs. If everyone returns to business as usual after the inspection, nothing has been achieved. PDCA cuts deep into the organisation and must not be done superficially, once a year or so.
  2. A PDCA without KPIs is like a car without wheels. Name and quantify the desired improvement of one or more KPIs in your plans. In Do you analyse the data behind the KPIs; in Check you compare execution with the objectives.
  3. Always apply the cycle integrally: go through all steps. People tend to cherry-pick, or get no further than the P and the D and drop out at the C. Integral application, properly secured with KPIs in the line, eventually translates into better (financial) performance.
  4. PDCA applies at strategic, tactical and operational level. The levels are closely interwoven: strategic plans set the frameworks for tactical and operational plans, and progress reports from the Check phase are input for the higher plans.
  5. Test your plans against execution regularly. Start as soon as possible. There are plenty of projects that began with the best intentions but went completely off the rails for lack of interim adjustment.
  6. Make data analysis a fixed part of the Do phase. Only with sound data analysis do you find the root cause of problems.
  7. Take the Check phase seriously. Reserve, for example, half an hour every two weeks for each team and employee. Is the process running as expected? Does the output meet the norms? Do deviations stay within control limits? How is the trend developing?
  8. Always link the big PDCAs to the small ones. A single yearly PDCA at policy level is too cumbersome for continuous improvement; employees who only focus on small daily loops lose sight of the bigger development. The big PDCA gives direction, frameworks, stability and room for investment; the small loops are small enough for a person to recognise themselves in and large enough to measure their own functioning against.
  9. Base decisions on facts, not on opinions or feelings. Inspiring managers regularly adjust norms and KPIs but raise the bar a little each time. Employees are “in control” and experience more job satisfaction thanks to their autonomy.
  10. Link PDCA to lean. Look for symptoms of poor processes such as long lead times, many extra checks, retyping data, high work stocks and many exceptions. Search for the eight wastes: overproduction, overprocessing, waiting, transport, inventory, motion, defects and unused talent. Start a new PDCA circle for each waste. Read more about lean.
  11. The D of Data and the D of Do: better financial results. Large-scale PDCA research by Passionned Group shows that applying Plan-Do-Check-Act company-wide not only improves profit margins: work stocks drop drastically and customers are more satisfied. The rules of thumb: set norms and targets per KPI (Plan), use steering information and KPIs consistently for analysis, action, improvement and innovation (Do), talk about the figures and address each other on performance (Check), and evaluate and adjust norms and targets regularly (Act).

The data-driven PDCA

Adding four new dimensions to the traditional circle creates a data-driven PDCA cycle, introduced by Daan van Beek: Plan is extended with Passion, Do with Data, Check with Conscious control and Actualise with Autonomy.

  • Passion: every plan ultimately starts with a personal mission: someone who really wants something different, has a dream, or personally feels the urgency to improve something.
  • Data: doing alone is not enough. Doing based on data analysis and irrefutable facts, which reliably monitor the impact of attitude and behaviour over a longer period, extends this phase.
  • Conscious control: the constant feedback of data and effects, and talking about them, activates a learning loop. People become increasingly aware of their own role, the role of others and how the whole system responds, so that they can adjust plans consciously.
  • Autonomy: by going through PDCA circles the professional develops more and more autonomy and can determine on the basis of data what works and what needs adjusting.

This enrichment respects the ideas of William Edwards Deming, who was a strong advocate of using statistics and data in the PDCA circle.

PDCA circle = Deming circle

In practice the PDCA circle, the Deming circle, the Deming wheel and Deming’s quality circle are used interchangeably, as are PDCA cycle and Deming cycle. There is no essential difference: they are all synonyms for the same concept of continuous improvement, controlled process optimisation and data-driven working.

How Diamond Decisions applies the PDCA cycle

Diamond Decisions uses the PDCA cycle as the rhythm in which decisions are taken and followed up. In inspiration sessions the why becomes clear, business modeling delivers the plan with goals and KPIs, data analytics feeds Do and Check with reliable figures, and the decision makers close the loop in a fixed meeting rhythm.

Talk to the author

Leo KerklaanLeo Kerklaan
Diamond Decisions

Discuss your question with Leo

Tell us where decisions in your teams get stuck today. In a no-obligation conversation we explore how everyone can make better decisions with data every day.

Schedule an introduction →

Step 4 of our approach

Decision Makers

From data to better decisions every day, in every team.

Explore Decision Makers →

Frequently asked questions

01

What does PDCA stand for?

Plan, Do, Check, Act. In this context Act does not mean action but actualise: updating goals and plan.

02

What is the purpose of a PDCA cycle?

To set a continuous learning and improvement process in motion that improves the performance of organisations, teams and individual employees step by step. Not once, but continuously.

03

What are the basic principles of the PDCA cycle?

Setting norms and targets, using information to improve and innovate, regularly evaluating and adjusting norms and targets, using information consistently for analysis and action, and addressing each other on positive and negative performance.

04

What is the difference between the PDCA circle and the Deming circle?

There is none. They are synonyms. William Edwards Deming is regarded as the founder of the original PDCA circle.

05

What is the difference between the big and the small PDCA cycle?

The big PDCA gives direction and frameworks at policy level over a longer period. The small PDCAs are improvement loops small enough for a person to recognise themselves in and large enough to measure their own functioning against.

06

What is the difference between PDCA and the data-driven PDCA?

The data-driven PDCA, introduced by Daan van Beek, enriches the Deming circle with four elements with the same initials: Passion, Data, Conscious control and Autonomy.

07

What is the relationship between PDCA and lean?

Lean distinguishes eight forms of waste. For each of them you can start and run a separate PDCA cycle, or combine wastes in one cycle.

08

How do you start with PDCA in an SME?

Choose one process and one KPI, set a norm, discuss the figure in a fixed short meeting every week or fortnight, and adjust. Once that small circle turns, link it to the yearly plan.

09

When is working with PDCA finished?

Never. PDCA means continuous improvement, with the emphasis on continuous.

Further reading

About the author

Leo Kerklaan

Leo Kerklaan

Leo is a strategy professional who advises, teaches and writes about strategic performance management, in business and government, in the Netherlands and abroad. He is the author of several management books, including the bestseller De cockpit van de organisatie.

About Diamond Decisions

Diamond Decisions helps organizations become better by enabling better decisions. We don’t start with data, dashboards or AI, but with the decision that needs to improve, and work back from there to KPIs, data and technology. We do that in four steps: inspiration and alignment, business modeling, analytics and data platform and data-driven decision makers. That way BI and AI don’t remain an IT project, but deliver value every day.