
Rework: what it is and how to prevent it
Rework means having to do work again because a (structural) error has crept into a process or project. It is frustrating, expensive and bad for customers and employees, but it is also the key to continuous improvement: anyone who detects, analyses and prevents rework raises quality, speed and margin at the same time.
Key takeaways
- Rework is work that has to be carried out again and restores the situation to what it should be. It is the basis for preventing future problems.
- Rework is an important indicator of quality with a direct impact on profitability and on customer and employee satisfaction.
- Rework causes a cascade: one delay or error triggers extra work, costs and waste further down the chain.
- Most rework comes down to attentiveness, thoughtfulness and quality control in every step of the process.
- According to Deming, higher quality means less rework and waste, lower costs, higher productivity, a growing market share and more jobs.
What is rework?
Rework is work that has to be carried out again and restores the situation to what it should be. It thereby forms the basis for preventing future problems.
Literally, rework means ‘the work that has to be done again’: the process or process step has to be gone through once more. There is in fact a hole in your process. But rework involves more than doing it again: there is the repair work, and there are the measures you must take to prevent it next time. At first rework seems easy to solve, simply by doing the work again but properly. To prevent it in the future you have to embrace continuous improvement and sharpen your KPIs.
Repairing versus preventing rework
Doing it again solves today’s problem; prevention solves tomorrow’s.
Repairing
Preventing
Focus
The faulty product or service
The cause in the process
Moment
Afterwards
Beforehand, at the source
Costs
Recurring
One-off investment
Effect
Customer helped, cause remains
Quality rises structurally
12 examples of rework
Example 1: aircraft arriving late
An aircraft arrives late at its destination. Depending on the delay, the landing has to be rescheduled, travellers may miss their connecting flight or train, the people waiting for them have to kill time, baggage handling gets confused, the catering for the next flight may arrive far too early, and the airport can impose a fine. Rework thus causes a cascade of misery, and with it waste. This can be tackled with the lean method.
Example 2: car recalls
The impact of rework can be very high. Think of recalls in the car industry, where structural errors in the production process lead to cars being called back. Recalls regularly cause legal proceedings, damage to image (certainly when it takes a long time), sharp falls in revenue, high replacement costs or even government sanctions.
Ten more examples
- A certificate of a course participant contains a wrong name. It has to be reprinted and posted instead of handed over in class.
- A registered parcel cannot be delivered and you have to come back at another time.
- A TV or smartphone that does not work after purchase has to be transported back, repaired and delivered again.
- A project that should deliver a new IT system never gets finished. Management pulls the plug. The old system remains, but still has to be replaced.
- Cleaning is done carelessly. The customer does not accept it and demands that the cleaners start again, properly this time.
- Builders make a roof that is rotated 90 degrees. The future resident looks at the drawing and asks for it to be put right.
- You have a book printed and notice that front and back have been swapped, or that the ISBN is wrong. It has to be printed again.
- A door opens inwards instead of outwards, which is a great risk in case of fire. The fire brigade points out that this must be corrected.
- A defendant challenges a court for partiality, new judges have to be appointed and the case starts all over again.
- The data for your graduation research turns out, after publication, to be incorrect or manipulated. You have to redo the research to graduate.
A number of patterns emerge from these examples. It all has to do with attentiveness, thoughtfulness and quality control in every step of the process. The question is how involved your employees are in that respect, and how you could increase that involvement.
Deming: quality sets off a chain reaction
Fortunately much rework can be avoided by raising the quality of your processes, products and services. That is the most future-proof solution. Dr William Edwards Deming, known for his System of Profound Knowledge, showed which effects you can then expect. You get not only less rework and fewer errors, but also far less waste. That lowers costs and improves productivity. Market share grows because the ratio between price and quality improves. The company grows and needs more people, which is good for society because jobs are added. Raising quality awareness can therefore have enormous positive consequences. The key is to look at the rework: that makes people aware of quality and how to improve it.

Reducing rework in your organisation
Various improvement methods help to minimise rework. The most important ones improve:
- from the perspective of quality management: the quality of the output;
- from the perspective of process management: the process itself;
- from the perspective of lean: productivity and added value.
Rework is also a crucial KPI to steer on: make it visible per process step, discuss it with the team and look for the cause. See the overview of improvement methods for more approaches.
How Diamond Decisions tackles rework
Diamond Decisions treats rework as a signal that a decision earlier in the process was taken with too little information. After inspiration, business modeling locates where in the process the rework arises, data analytics measures how often and at what cost, and the decision makers choose the preventive measure and follow its effect.
Talk to the author
Leo KerklaanDiamond Decisions
Discuss your question with Leo
Tell us where decisions in your teams get stuck today. In a no-obligation conversation we explore how everyone can make better decisions with data every day.
Schedule an introduction →Step 4 of our approach
Decision Makers
From data to better decisions every day, in every team.
Explore Decision Makers →Frequently asked questions
01
What is rework?
Work that has to be carried out again to restore the situation to what it should be, including the repair and the measures to prevent it in future.
02
Why is rework an important KPI?
Because it is a direct indicator of the quality of what you do or make, and affects profitability, lead time and the satisfaction of customers and employees.
03
What is the difference between rework and waste?
Waste is the broad lean concept for everything that adds no value. Rework is one form of it: doing work again because of defects. Rework in turn causes other waste, such as waiting and extra transport.
04
How do you reduce rework?
Detect and analyse it quickly, repair it, and take preventive measures at the source: better quality control in each step, a cleaner process and continuous improvement with KPIs.
05
How does an SME get a grip on rework?
Keep a simple tally for a month of every time work has to be redone, with the reason. The top three reasons usually explain most of it and show where prevention pays off first.
Further reading
Sources
- The W. Edwards Deming Institute: Deming the man.
About the author
About Diamond Decisions
Diamond Decisions helps organizations become better by enabling better decisions. We don’t start with data, dashboards or AI, but with the decision that needs to improve, and work back from there to KPIs, data and technology. We do that in four steps: inspiration and alignment, business modeling, analytics and data platform and data-driven decision makers. That way BI and AI don’t remain an IT project, but deliver value every day.

