Abstract background

Case: Safety Region Noord-Holland Noord (2)

Part 1 mapped every step in the work process of the Safety Region Noord-Holland Noord. In part 2 the improvement team finds out which steps cost extra time, which can be accelerated and which can simply be skipped. The data shows that minutes are lost above all in the handovers.

Key takeaways

  • The ECG decides whether a patient needs angioplasty, so the second ambulance crew member now makes it immediately while the nurse talks to the patient.
  • Precious time is lost in the handovers between ambulance and hospital, where the patient is on nobody’s radar.
  • After arrival at the hospital, patients were wheeled around for three minutes on average before reaching the cath lab.
  • Patients whose ECG shows that angioplasty is needed now go directly to the cath lab and skip the emergency department.
  • Speed is never the only criterion: reliability and safety always come first.

Use the improvement opportunities

By smartly combining all available data, part 1 of this case brought all intermediate steps into view. The improvement team led by Martin Smeekes now asks: why does something happen the way it does? What could be done faster (improve)? Can things be set in motion earlier to shorten the trajectory further on (accelerate)? Is there room for a different approach or protocol (redesign)? Can we skip steps (innovate)?

The team is in a creative phase of cutting, pasting, doing, discussing, cracking assumptions and drawing up new hypotheses. On some parts of the chain you have direct influence, on others not. Driven by passion and fed by the right data flows, the team sees ever more improvement opportunities. The first improvement, dispatching ambulances immediately, was discussed in part 1.

The ECG is leading from now on

A second improvement came into view by looking at the moment the electrocardiogram was made. The ECG decides whether or not someone must undergo angioplasty. If you know that five minutes earlier, you can set the actions in motion earlier so that the cardiac specialists are ready. It is not only about doing things as early as possible (Do), but also about doing the right check as quickly as possible, so that you can Act sooner.

Previously the ambulance nurse first talked to the patient. That protocol has changed for heart attack patients: the nurse still talks to the patient, but the second crew member, who is also the driver, makes the ECG immediately. If it shows that angioplasty is needed, a new PDCA cycle starts: a new plan based on the urgency tested and validated in the previous cycle.

Let no precious time be lost in handovers

A third improvement came from analyzing the data further. Precisely in the transitions, where one responsible party hands the patient over to the next, precious time is regularly lost. The patient has disappeared from the radar of the ambulance service and is not yet fully visible on the radar of the hospital. It almost seems as if the time in between does not count. The ambulance crew hurries to deliver the patient at the emergency department, and the hospital staff gets to work from the moment they know the patient’s status. In between, a patient can easily be on hold for a few minutes.

Eliminate superfluous intermediate steps

Smeekes noticed that from arrival at the hospital the patient was wheeled around for another three minutes on average before reaching the cath lab. But if the ECG already makes clear that angioplasty is needed, why not go directly to the cath lab? That skips the emergency department (ED), which is always hectic, especially at weekends. With one structural intervention, minutes were gained twice.

The minutes-long walk did not need to be covered faster; it could be skipped altogether. This is where data leads to a fundamental insight in the Check phase.

You keep an overview of the whole trajectory by measuring all of it and then critically examining the data. Shared with professionals, it makes them more aware than ever of the total time something takes. The insight that the ED is not the best drop-off point for patients who need angioplasty did require a rigorous adjustment of the ambulance’s route.

Three improvements in the call-to-balloon chain

Each improvement came from measuring a different part of the chain.

Old situation

New situation

Dispatch

Question first, then send

Send at once, question en route

ECG

After talking to the patient

Immediately, by second crew member

Arrival

Via emergency department

Straight to the cath lab

Handover

Time in between not measured

Whole chain on one stopwatch

Control

Imposed from above

Collective insight

Call-to-balloon: conscious control

After the passion from which the plan arose and the Do phase that yielded data and intermediate times for the whole trajectory, a form of conscious control arises. Professionals become more aware than ever of where and how time can be gained. They gain more direction and grip, see how long each step takes in practice, and start intervening and deciding themselves wherever possible and necessary.

See each other as dependent chain partners

All partners, the ambulance crew, hospital staff, coronary care nurses, the anaesthesiologist and the interventional cardiologist, start to see each other as joint chain partners. Together they analyze what the total time goes into. The stopwatch only stops when the angioplasty has actually been done and the stent has been placed. Bringing the total throughput time into view greatly sharpens awareness. Only by giving insight do people feel the need to improve their process.

Never compromise on reliability and safety

Conversations with professionals show that it must never be only about speed. Medical service reaches a high level only when speed is combined with reliability and safety. Actions may never be rushed, but time may never be wasted unnecessarily either. This awareness ensures that the Check phase is set up responsibly.

The facts speak for themselves

If the interventional cardiologist keeps everyone waiting while the patient has been lying ready for eight minutes, the data brings that to light. All places and moments where the process falters come to light relentlessly, whether through congestion, forgetfulness, a second emergency, a display of power or other priorities. Everyone becomes aware of it, and the decisions are there for the taking.

From making data transparent, monitoring becomes a natural next step. Control is no longer something that happens from above; it has much more to do with awareness and insight. It suddenly becomes known that a patient is wheeled through the corridor for three minutes on average, a revelation for many doctors. With a dashboard and dynamic visualizations you see the effect of every intervention, large and small, and how the whole accordion is pushed further and further together: the accordion effect.

How Diamond Decisions shortens throughput times

Diamond Decisions measures the chain, not the department. In business modeling we lay down the steps and handovers, with data analytics we put a time stamp on each of them, and we discuss the result with decision makers and professionals until the superfluous steps disappear.

Conclusion

The greatest gains in this case were not in working harder, but in checking earlier and skipping steps. That only became visible when the whole chain was measured and the figures were shared with everyone involved. Part 3 continues the case.

Talk to the author

Daan van BeekDaan van Beek
Diamond Decisions

Discuss your question with Daan

Tell us which challenge in this story you recognize. In a no-obligation conversation we translate the lessons to your organization.

Schedule an introduction →

Diamond Decisions

Our approach in 4 steps

From inspiration and business model to data analysis and better decisions: this is how we approach it for you too.

Explore our approach →

Frequently asked questions

01

Which improvements shortened the call-to-balloon time?

Three: dispatching the ambulance immediately and asking questions en route, making the ECG at once by the second crew member, and taking patients who need angioplasty straight to the cath lab instead of via the emergency department.

02

Why is so much time lost in handovers?

Because each party measures only its own part. During the handover the patient is no longer on the radar of the first party and not yet on that of the next, so nobody feels responsible for the time in between.

03

What is the difference between improving and innovating in a process?

Improving means doing an existing step faster or better. Innovating means skipping or replacing a step, as with the route straight to the cath lab. The largest gains often lie in steps that turn out to be unnecessary.

04

How can an SME apply the accordion effect?

Measure the whole lead time from order to delivery with a time stamp per step, including waiting times between departments. Then ask per step: can it be faster, earlier or skipped? Visualize the effect of each change.

Further reading

About the author

Daan van Beek

Daan van Beek

Daan co-founded Diamond Decisions and leads its further growth. He helps organisations translate strategy into day-to-day practice through a human-centred approach to data-driven working, and learns something new in every sector he works in.

About Diamond Decisions

Diamond Decisions helps organizations become better by enabling better decisions. We don’t start with data, dashboards or AI, but with the decision that needs to improve, and work back from there to KPIs, data and technology. We do that in four steps: inspiration and alignment, business modeling, analytics and data platform and data-driven decision makers. That way BI and AI don’t remain an IT project, but deliver value every day.

Schrijf je in voor de Masterclass